MERCHANDISING PROJECT (40 MW GAS-FIRED ENGINE)/ TURKEY-2020

The company has signed another contract with an European company to supply 40 MW capacity power plant which is under the operational phase as dismantling & marking &packing . The contract delivery term is DDU.

MERCHANDISING PROJECT (8.7 MW GAS-FIRED ENGINE)/ TURKEY-2020

The company has signed an agreement with a company in MiddleEast region to supply for 8.7 MW capacity gas-fired engine based on FCA delivery terms. The dismantling & packing & marking phase of the project is under the progress for this project.

MERCHANDISING PROJECT (21MW GAS-FIRED ENGINE)/ TURKEY-2020

The company has signed an agreement with a company in EU region to supply for 21 MW capacity power plant based on FCA delivery terms.The engines and auxl. has supplied from Antalya power plant. The dismantling & marking&packing phase have been completed and delivery phase is under the progress for this project.

POWER PLANT RELOCATION PROJECT (24 MW)/ TURKEY – 2019

11Industry has signed a new contract for relocation of 24 MW power plant based on turnkey operation. In respect of agreement, the power plant which is located in Southeast of Turkey will be dismantled + packed + shipped and re-assembled at new project site in Iraq by 11Industry & crew.

MERCHANDISING PROJECT (9.7MW GAS-FIRED ENGINE)/ TURKEY-2019

11Industry has bought one unit of 9.7 MW gas-fired engine to develop its commercial&operational activities. The same engines has been sold just in 3 weeks time to another project as completed design works by 11Industry engineers with completion of dismantling & renovation works.

INSTALLATION OF POWER STORAGE SYSTEM FOR NATURAL GAS POWER PLANT / HUNGARY – 2018

Power storage system equipments were transported, mounted and connected the system of power plant by 11Industry.

PROJECT OF REPLACE OF ALTERNATOR WITH NEW GENERATION / TURKEY – 2017

New generation alternator was transported and replaced the old one by 11Industry.

POWER PLANT RELOCATION PROJECT (20 MW)/ TURKEY-2016

All main machine groups, electronic and mechanical equipment were disassembled by 11Industry and they were transported and reassembled to the new jobsite.
Additionally, engine hall new steel construction were manufactured and assembled by 11Industry.

ENGINE CRANKSHAFT CHANGING / TURKEY-2016

Damaged crankshaft were changed (disassembled – assembled) with the new one by 11Industry as a service & repairment task.

PROJECT OF REMOVAL OF DAMAGED MACHINE FROM POWER PLANT / CYPRUS – 2015

Transfer to another country, of the generator, which was determined to have failure within the power plant, and transfer and reassembly of the related machine in the former power plant after repair.

POWER PLANT RELOCATION PROJECT (10 MW)/ TURKEY-2015